Second Phase of the Construction of the Berasi AME Zion School Cafeteria
Construction of the concrete pillars to hold up the roofing of the cafeteria were installed today. We constructed 14 strong concrete pillars in all. The wooden structure in the pictures attached to the building is used to create a concrete column, where the concrete is mixed with water and filled into wooden columns to make pillars. These pillars will later hold the roof of the building.